The Major Construction Project Table is a composite list of major construction projects on the island of Oahu.

Project IDs

AIEA/PEARL CITY

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H005 Kamehameha Highway Bridge and Roadway Maintenance Kamehameha Highway at Halawa Stream Bridge
H015 H-1 Freeway Guardrail and Shoulder Improvements  
H022 H-1 Pearl City Viaduct, H-1/H-2 Merge Deck Replacement Work H-1 Pearl City Viaduct, Waiawa Overpass to Waimalu Off Ramp, 3 eastbound right lanes closed, Monday to Thursday nights, 7:00 pm to 4:am


CENTRAL HONOLULU

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H028 H-1 Freeway, School Street Off-Ramp Drainage Improvements  
O002 S. King Street Shower tree pruning Pruning of 182 City maintained Shower trees  
P004 Safeway Kapahulu follow-up work  
P014 Wakiki Allure Street improvements  
R001 Rehabilitation of Various Streets on Oahu-FY2007 Street repaving Work is expected to be complete byJune 19, 2009 (weather permitting). Another Roadway Improvement project by the City and County of Honolulu
R003 Reconstruction of Lusitana Street Major street pavement reconstruction - Work is between Pauoa Avenue and Iolani Avenue Project limit is :  Lusitana St from Pauoa Ave to Iolani Ave.
R006 Rehabilitation of Streets, Unit 50 Pavement reconstruction/
resurfacing
Work is on Kalawao Place (Kalawao St. to end), Kalawao St. (Kahaloa Dr. to Private road), Kalehua St. (Kahaloa Dr. to end), Kaloaluiki St. (Lowrey Ave. to Kalawao St.) Kanu St. (Lowery Ave. to Loi St), Loi St. (E. Manoa Rd. to Woodlawn Dr), Kahawai St. (Lowrey Ave. to Huapala St), Woodlawn Dr. (Lowrey Ave to Kahaloa St), Lowrey Ave. (Woodlawn Dr. to Kalawao St) Kaaipu Ave. (Oahu Ave. to end), Loomis St. (makua End to Makai end), Hiehie St. (Kaloaluiki St. to end) and Vista Place (Lowrey Ave to end).
R012 Kapiolani Boulevard First Aid Repairs Roadway Rehabilitation Interim repairs to roadway providing temporary smooth surface until permanent repairs can be made. Project will commence week end of 1/17/09 is projected to continue thru 4 week ends depending on working conditions
S000 and W000 Kapiolani Boulevard Water and Sewer Improvements Water and Sewer Line Improvements This project’s goal is to rehabilitate the existing sewer and water systems along Kapiolani Boulevard. The areas of rehab include Kapiolani Boulevard from Ward Avenue to Kalakaua Avenue, Kalakaua Avenue from Kapiolani Boulevard to Ala Wai Canal. The construction consists of installing new water mains and laterals, rehabilitating sewer lines using Cured-In-Place Pipe methods, reconstructing deteriorated sewer manholes, upgrading the electrical system for traffic signals, installing new curb ramps and repaving and restriping portions of travel lanes.
S001 Beretania Street - 1617 Sewer Rehabilitation, McCully Trenching for replacement of sewer line Beretania Street between Punahou Street  to 1703 Beretania Street.  Project to begin on November, 2008 Project scope includes repair and replacement of sewer lines. 
S004 Kalihi Valley Reconstructed Sewer, Area 1 to 4 Rehabilitate 19,503 feet of 6 to 18 inch sewer pipes and 13 laterals Limits include: 3101 to 3129 Nihi St, Kua Pohaku Lane (Laelae Way to Holua Way), Laelae Way (2951 Laelae to Kua Pohaku). 1641-1731 Mahani Pl, 2970 - 2952 Papali Place, 3057 - 3048Papali St., Pualani St (1587 Puolani St. to Nihi St), 1560 Moani St. to Nihi St., 1552 Noe St. to Nihi St., 1546 Laulani St to Nihi St., 1552 Pahulu St to Nihi St., Valley View Dr. (Numana Rd. to Likelike Hwy), 2945 Numana Rd. to Valley View Dr.,3148 Kalihi St. to Kuapapa Pl., 1917 Heua Pl. to Kalihi St., 3340 - 3351 Kalihi St, 3601 - 3575 Kalihi St)
S005 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1E Structural and hydraulic rehabilitation of existing deficient gravity sewer Limits include:  Malanai Pl (Liliha St. to end), Vineyard Blvd (Liliha St. to River St) School St. to Stillman Lane.  Work is lcoated in Lower Kalihi, Pacific Heights, Punchbowl and the Liliha Areas.
S006 Kalihi/Nuuanu Area Sewer Rehabilitation, Phase 1G Structural and hydraulic rehabilitation of existing deficient gravity sewer Limits include:  School St. (McGrew Lane to Barron Ln), Hialoa St. (Nuuanu Ave to end), Kaulia St. (Nuuanu Ave to Pali Hwy), Kuakini St. (Nuuanu St to Pali Hwy), Funchal Lane (Pauoa Rd to Pali Hwy).
S012 Peterson Lane and Pua Lane Sewer Rehabilitation   Sewer rehabilitation of 4,450 feet of 8 - 12" diameter sewer line. N. King St. between Peperson Lane and Dasha Lane, Pua Lane between Vineyard Blvd. to N. King St. 
S015 University Avenue 1918 Sewer Rehabilitation Manoa    Replacement of existing sewer University Avenue between Sea view Avenue to Vancouver Drive.
S016 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Streets include:  Piikoi St (1164 Piikoi St to Pensacola St), Prospect St. (Pensacola St. to Thurston Ave), Wilder Ave (Pensacola St. to Thurston Ave), Kamamalu Ave (Iolani Ave to San Antonio), Hualii St (Kamamalu St. to Lusitana St), Avon Way (Spencer St to end), victoria St. (Lunalilo St. to Green St), Emerson St. (Lunalilo St. to Green St), Alapai St (Magellan Ave to Prospect St), Iolani Ave (Frear St to Lusitana St), Prospect St. (Alapai St. to Miller St), 2220 - 2146 Kamehameha Hwy, Factory St (N. King St to Waterhouse), Kopke St. (Waterhouse to Stanley St), Gulick Ave (Waterhouse to Stanley St), Puuhale Rd. (Kahanu St. to Kaumaulii St), Bannister St (N. King St to 708 Bannister St), N. King St (Kopke St. to Kalii St), Kopke St. (Hanu Ln. to N. King St), Lanu Lane (Kopke St to end), Pulaa Ln. (N. King St to end), Huene St (Maui St to Wyllie St), Puunui Ave (Kauai St. to Hawaii St), Pahukui St (Nakuina St. to Gulick Ave), Kealoha St (Nakuina St. to Gulick ave),Uhu St. (Gulick Ave to end),  1048 Kamehameha IV Road to Coombs Ln., 1231 Gulick Ave to Kealoha St., 1032 Horner St to Middle St, 1214 - 1220 Kamehameha IV Rd, 1021 Middle St. to Kahauiki St, Kalihi St (Day Pl. to Beckley St), 1132-1146 Pinkham St., Hani Ln (Kalii St to Pulaa Ln), Leilani St (Fernandez St. to Lakapu St.), Fernandez St. (Adelaide St. to Leilani St), N. School St (Likelike Hwy to Haupu Pl),  Adelaide St. (Fernandez St to Lakapu St),  1534 Gulick St. to N. School St., Waikoae Rd. (Amelia St to Martin St), 1667 - 1702 Lima St., Bulick Avenue (Ulana St. to Ano Ln).
S017 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Streets include:  Meyer St. (Notley St. to 1530 Meyers St), 2354 Pio Pl. to Kamehameha IV Road,  1506 Kamehameha IV Road to Pio Place, 1556 Kamehameha IV Road to N. School St., 811-905 Umi St, 1801 - 1820 Ahuula St, 924 Self Lane to Akina St., 1734-1826 Eluwena St, 2112-2138 Mahalo St, 633-656 N. Judd St., 2042 - 2009 Nu Pl, Keola St (Kealakai St to Lanakila Ave), Lanakila Ave (N. Kuakini St to Simon Rd), Luka St. (Lanankila Ave. to Kealakai St), 1110 Hala Dr. to Kalepa Pl, Hala Drive (Laki Rd to Lolena St), Kealakai St. (Laki Rd. to Luka St), 2069 Iholena St. to N. Judd St, 818 Iholena Pl. to Iholena St
S019 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Limits include:  1843 - 1925 Pacific Heights, Punchal St. (Pali Hwy to Pali/Pauoa Rd), Nuuanu Ave (S. Kuakini St to Muliwai Lane), 27 Kauila St to Nuuanu Avenue, 1629 Nuuanu Avenue to Kauila St., 36 - 50 Bates, 20 Muliwai Lane to Nuuanu Avenue, 1817 - 1829 Lusitana St, 1817 Puowaina Dr to Kamamalu Avenue, 135 to 111 boyd Lane, 1819 Pacific Heights to S. Kuakini St, 214- 244 San Antonia Ave, 215 Puuhue Pl. to 1641 Stillman, Frog Lane (Puuhue Pl. to N. School St.) 1616 Stillman Lane to N. School St.
S020 Houghtailing Street Area Sewer, Area 1 and 2 Rehabilitate existing sewer Limits inlcude:  15412 Hanai Loop to Kapalama Ave, 2021 -2040 Aupuni Street, 2153 Aupuni St. to 1601 Kealia Dr., 1505 - 1537 Kealia Drive, Aupuni St. (N. School St. to Konia St), 2118 Houghtailing St. to Hillcrest St, 2228 - 2240 Makanani Drive, 2015 Naio St. to Makanani Drive, Aupuni st to 1223 Alani St. and 1116 N. School St. to Aupuni St. 
S021 Wilhelmina Rise Sewer Rehabilitation Work on existing sewer line Street include:  Keanu St (wilhelmina Rise to 13th Ave), Wilhelmina Rise (Keanue St to Pukalani Pl), Wilhelmina Rise (Sierra Dr. to Sierra Dr), Sierra Dr (Nihipale Place to Halehoola Pl), Halehoola Pl. (Sierra Dr to end), Anuhea Place (Anuhea St. to end), Puumalu Place (Paula Dr. to end) Paloma Pl. (Paula Dr to end), Pili Place (Paula Dr to end), Carnation Place (Iwi Way to end), Iwi Way (Niele Pl. to Paula Dr), Pioi Pl(Niele Pl. to end), Lurline Dr. ( Monterey Dr to Matsonia Dr), Lanipoki Pl. (Lurline Dr. to end) and Lurline Dr. near Sierra Drive.
S023 St. Louis Heights Sewer Rehabilitation Rehabilitate existing sewer Streets include:  St.  Louis Dr (Dole St. to Bertram St), Dole St. (St. Louis Dr. to Frank St.), Frank St. (Dole St. to Eugene Pl), Eugene Pl. (Frank St. to end), Alphonse Place (Frank St. to end), Robert Place (Frank St. to end), Kaminaka Dr. (St. Louis Dr. to Kanalui St), Kalaepohaku (Kaminaka Dr. to Akeakamai St), Pule Place (Kalaepohaku to end), Kalaepohaku to end, Kanalui St. (Kaminaka Dr. to end), Akeakamai St. (Kaminaka Dr. to end), Alencastre St. (St. Louis Dr. to St. Louis Dr), Felix Street (Alencastre St. to St. Louis Dr), Gulston St. (Alencastre St. to St. Louis Dr), Herman St. (Alencastre R[16]CSt. to St. Louis Drive), Libeert St. (Alencastre St. to St. Louis Dr), Maigret St. (Alencastre St. to end), Alencastre Place (Alencastre St. to end), Bertram St. (St. Louis Dr. to Peter St), Noah St. (St. Louis Dr. to St. Louis Dr), Oswald St. (St. Louis Dr. to St. Louis Dr), Peter St. (St. Louis Dr. to end), Quincy Place (Peter St. to end), Ruth Place (Peter St. to end).
S026 Kalihi/Nuuanu Area Sewer Rehabilitation Sewer line rehabilitation between N. Judd Street to 1069 Iholena Street
S031 Puolo Drive 1085 Sewer Rehabilitation Sewer line rehabilitation Puolo Dr from 1079 Puolo Drive to Ukama Street
S033 Kalihi/Nuuanu Area Sewer Rehabilitation Phase1C Rehabilitation of existing sewer Middle Street - H-1 to Kamehameha Hwy, Horner Street - H-1 to Omilo Lane, Kamehameha IV Rd. from Pio Place to School St.,Kanoelani Road from Hiu Street to end, Kalama Road from Hiu St. to End, Laniuma Road from Hiu Street to end, Amelia Street from Waikoae Road to School Street, Waikoae Road from Amelia Street to Martin Street, Dement Street from Lohilani St. to Ula Lane, Ula Lane from Dement Street to end, Gulick Avenue from H-1 to Pahukui Street,Gulick Avenue from School Street to Hiki St., Fernandez Street from Adelaide Street to Kalihi St. and Kalihi Street from Mailu Street to Perry Street.
S034 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D Rehabilitation of existing sewer Lanakila Avenue and School Street, Alaneo Street from School St. to Kuakini St., Lolena St. from Kealakai St. to Iholena St., Pacific Heights Road from 2455B to 2455C, Captain Cook Avenue and Alapai Street, Wilder Avenue from Piikoi Street to Makiki Apts.
S035 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A Rehabilitation of existing sewer Puuhale Rd. from Kalani Street to Dillingham Blvd., Mokauea St. from Kalani St. to Dillingham Blvd., Hau Street from Puuhale Rd. to Kalihi St., Colburn St. from Puuhale Rd. to Kalihi St., Dillingham Blvd from Puuhale rd. to Mokauea St., Eluwene St. from Puuhale Rd. to Kalihi St., Kaumaualii St. from Puuhale Rd. to Kalihi St., Ahuula Street from Puuhale Rd. to Mokauea Street.
W002 Maunalaha Homesites W.S.I. 8" D.I. water main installation Round Top Dr. between Makiki St. & Maunalaha Rd.
W008 Kalihi WSI Part I Installing water mains  
W010 LOCK UP STORAGE Installing water meters  

 

CENTRAL OAHU

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H003 Kamehameha Highway Guardrail and Drainage Work Kamehameha Highway between Lehua road and Waikalani Drive
H004 Kamehameha Highway Pavement Sealing Work Kamehameha Highway in both directions between the H-2 Freeway Overpass, and the Karsten Thot Bridge
P005 Lakeview Circle Development S/W, D/W, Utility Lakeview Circle

 

EAST HONOLULU

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H025 Kalanianaole Hwy. near Hanauma Bay Paving and Shoulder Work Intermittent single lane closures on Kalanianaole Hwy., weekdays, 8:30 am to 3:00 pm
H027 Kalanianaole Hwy., Sewer Line Work near Hawaii Kai Sewer Line Work  
R004 Rehabilitation of Street, Unit 38 Pavement reconstruction/
resurfacing
Kilauea Avenue
S010 Kuliouou Sewer Rehabilitation and WWPS Modifications - Sewer rehabilitation Sewer rehabilitation Project limits are:  Summer St, Kalanianaole Hwy. (Moomuku Pl to May Way), Paeoki Dr. (Summer St. to Kalanianaole Hwy), Kuliouou Rd (Summer St. to Dalene Way), Bay St. (Kalanianaole Hwy to end), Moomuku Pl. (Kalanianaole Hwy to end), Elelupe Rd ( Kalanianaole Hwy. to Eleupe Pl), May Way (Kalanianaole Hwy to Maunalua Ave), Maunalua Ave (Summer St to end),  Maunalua Ave (May Way to Makaniolu Pl), Makaniolu Pl. (Maunalua Ave to end), Keoki Pl (Kuliouou Rd. to end), Wakine St (Kuliouou Rd. to end), Pahukula Pl. (Kuliouou Rd to end), Manukapu Pl (Kuliouou Rd. to end), Kawekiu Pl (Kuliouou Rd. to end), Dalene Way (Kawekiu pl. to 176 ft. north).
S025 Kahala Avenue Sewer Structural Rehabilitation Sewer line rehabilitation Kahala Ave Betweeen 4767 - 4925 Kahala Avenue
W003 job 08-004 Wilhelmina Rise Water System Improvements, Part III install new water main Intermittent lane closures on Wilhelmina Rise between Anuhea St. and Sierra Dr. at Maunalani Park. 8:30am to 3:30pm M-F. Contractor progressing from mauka end of Wilhelmina Rise headed Makai.Currently in front of Maunalani Park.

 

EWA

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H010 Fort Weaver Road Road Widening Fort Weaver Road from Laulaunui Street to Renton Road.  The work is part of Phase II of a project to widen Fort Weaver Road from four lanes to six, adding an additional traffic lane in each direction from Aawa Drive to Geiger Road.  Phase II is expected to be completed in mid-2009 at a total cost of $59.85 million, 80% of which will paid for with federal funds and 20% by state funds. Phase I of the project was completed in August 2006 and widened Fort Weaver Road from four-to-six lanes from Farrington Highway to Aawa Drive
H013 North South Road Phase 1C Farrington Hwy Reconstruction Work H-1 Freeway between Kunia Interchange and Makakilo Interchange
H022 H-1 Pearl City Viaduct, H-1/H-2 Merge Deck Replacement Work  
H024 Farrington Highway at Piliokahi Ave. Waterline Replacement  
P006 Street Improvements for Kapolei Commons Roadway Widening  
P010 Street Improvements for Costco Kapolei Roadway Improvements  
S013 Renton Road Sewer and Manhole Rehabilitation Replacement/
repair  of 11,670 feet and 52 sewer manholes
Renton Road at various locations. 

 

LEEWARD

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
R010 Rehabilitation of Secondary Streets by Contract - FY 09 Group 2 Roadway reconstruction/
resurfacing
Halona Rd (Lualualei Homestead Rd to Puhawai Rd) and Lualualei Homestead Rd (Hale Ekahi Dr. to  end). 
W004 FARRINGTON HIGHWAY PART I, PHASE "A" & "B" 12-INCH AND 24-INCH WATER MAINS INSTALLATION OF NEW 12-INCH AND 24-INCH WATER MAINS Along Farrington Hwy.between Pili-O-Kahe Beach Park road entrance and Pili-O-Koe Stream. On Monday, 5/18/09, makai Honolulu bound lane closed, contra flow in place at work areas from 8:30 am – lunch, 2 Honolulu bound lanes and 1 Waianae bound lane open… from lunch – 3:00 pm, 2 Waianae bound lanes and 1 Honolulu bound lane open (8:30 am to 3:00 pm). Starting Tuesday, 5/19/09 to Friday, 5/22/09: 2 -Honolulu bound lanes closed No contra flow...1 Honolulu bound lane and 1 Waianae bound lane open (8:30 am to 3:00 pm). Two Special Duty Officers to control traffic flow ( Assist contractor at work areas.).
W005 99-41 FARRINGTON HIGHWAY : 30inch and 24 inch Transmission Mains - Ph I INSTALLATION OF NEW 24" DI MAIN. Start of chlorination and flushing of new 24" DI water main. Delta will be working near Hawaiian Water Park . No lane closures.

 

WEST HONOLULU

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H016 H-1 Freewy, Airport Viaduct Concrete pavement repair  
H020 Nimitz Highway/Pacific Street Intersection Traffic Signal Work  
R005 Rehabilitation of Streets, Unit 49    Roadway reconstruction/
resurfacing
Work is on Alewa Drive between Wyllie Street to Hoomaikai Street.
S027 Waipahu Street/Plantation Village Sewer Reconstruction Sewer line rehabilitation between Awamoi Street to Plantation Village. 
S029 Hanawai Circle Sewer Rehabilitation Sewer line rehabilitation Farrington Hwy (Waipahu Depot to Hanawai Circle) and Hanawai Circle (Farrington Hwy to end)
S030 Kilani Avenue 211/Ilima Street 91 Sewer Rehabilitation, Wahiawa Sewer line rehabilitation Kilani Ave/ Illima Street Work is between California Avenue to 75 Ilima Street
W006 Kalihi WSI Part II Ph.B Adjusting and removing of manholes, Misc. Sidewalk work  
W007 Sand Island WWTP Installing water meters  

 

WINDWARD

Project ID
Project Name
Reason for Lane Closure
Project Limits, Project Summary and Anticipated Dates of Construction
H018 Kamehameha Highway, Burroughs Rd. and Kualoa Regional Park Rd. Drainage box construction, concrete backfill and pavement restoration  
H021 Kahekili Highway, West Hui Iwa St. to East Hui Iwa St. Trenching and Pavement Repair Possible lane closures on Kahekili Highway between West Hui Iwa St. and East Hui Iwa St. in both directions, weekdays, 8:30 am - 3:00 pm
P001 151 Hekili St 2412 frontage imp. 151 Hekili St
R013 Rehabilitation of Streets, Unit 46 Roadway reconstruction/
resurfacing
Kailua Road (Hamakua Bridge to Kuulei Road); and Kuulei Road (Kailua Road to Kainalu Drive) Construction Mgr - Michael Yuen (x8839) NTP DATE TBD
R015 Rehabilitation of Streets, Unit 63 Roadway reconstruction/
resurfacing
 
S002 Kailua/Kaneohe Sewer Rehabilitation-Phase 1 Sewer replacement  
S003 Kalaheo Avenue, Mokapu Road/Aikahi Loop Sewer Rehabilitation Rehabilitate 3,400 feet of 66-inch diameter pipe and 9 manholes. Limits include:  Mokapu Rd. between Kalaheo Ave. to Aikahi Loop, Aikahi Loop between Mokapu Blvd. to Kailua RVWVTP.  Construction is on-going.
S018 Kaneohe Bay Drive Trunk Sewer Relocation Relocation of existing trunk line Limits include:  818 Iholena Place to Iholena Street, 44-11 to 44-2 Malukai Place, 44-13 to 44-1 Nohokai Place and 44-6 to 44-2 Hulakai Place.
S022 Wanaao Road/Keolu Drive Reconstructed Sewer Rehabilitation existing sewer Streets include:  Keolu Dr (Nanialii St. to Wanaao Rd) and Wanaao Rd. (Keolu Dr. to Auwinala Rd)