The Construction Traffic Advisories Table is a composite list of lane closures on the island of Oahu. Advisories are listed by project.

|
AIEA/PEARL CITY
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H005 |
Kamehameha Highway |
Bridge and Roadway Maintenance |
Detour around construction area on Kamehameha Highway at the Halawa Stream Bridge, 24 hours/7 days a week. |
|
| H015 |
H-1 Freeway |
Guardrail and Shoulder Improvements |
H-1 Freeway between Hickam/Nimitz Hwy. on-ramp to Aiea off-ramp, outbound right lane and shoulder closures, weekdays, 9:30 am to 2:15 pm; also, intermittent right and shoulder lane closures between Hickam AFB on-ramp and Aiea/Pearlridge off-ramp (Exit 13A), weekdays, 9:30 am to 2:15 pm. |
|
| H022 |
H-1 Pearl City Viaduct, H-1/H-2 Merge |
Deck Replacement Work |
H-1 Pearl City Viaduct, Waiawa Overpass to Waimalu Off Ramp, 3 eastbound right lanes closed, Monday to Thursday nights, 7:00 pm to 4:am |
|
CENTRAL HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H028 |
H-1 Freeway, School Street Off-Ramp |
Drainage Improvements |
Off-Ramp continuously closed from 9:30 pm, June 28, 2009 to July 10, 2009. To install concrete barriers on June 28-29, one westbound lane closed at 9:30 pm, then, two lanes closed from 11:30 pm to 5:00 am |
Use Palama St. Off-Ramp |
| O002 |
S. King Street Shower tree pruning |
Pruning of 182 City maintained Shower trees |
Intermittent lane closures on S. King Street from Alapai St. to Univeristy Ave. 7:30am-4:00pm Mon. to Fri. S. King Street between Alapai St and University Avenue. |
|
| P004 |
Safeway Kapahulu |
follow-up work |
Intermittent lane closures on Kapahulu Ave fronting the Safeway Kapahulu |
24-hours |
| P014 |
Wakiki Allure |
Street improvements |
Lane closures on Kalakaua Ave from Ala Wai Canal to Ena Road on Saturday 8:30am to 3:30pm |
|
| R001 |
Rehabilitation of Various Streets on Oahu-FY2007 |
Street repaving |
Work on Nehoa Street between Auwaiolimu Street and Punahou Street - mauka lanes. One lane of traffic is opened at all times. Work to begin between 8:30 a.m. to 3:30 p.m. |
Work is expected to be complete byJune 19, 2009 (weather permitting). |
| R003 |
Reconstruction of Lusitana Street |
Major street pavement reconstruction - Work is between Pauoa Avenue and Iolani Avenue |
Road work suspended |
|
| R006 |
Rehabilitation of Streets, Unit 50 |
Pavement reconstruction/
resurfacing |
Intermittent lane closures on Kalawao Place (Kalawao St. to end), Kalawao St. (Kahaloa Dr. to Private road), Kalehua St. (Kahaloa Dr. to end), Kaloaluiki St. (Lowrey Ave. to Kalawao St.) Kanu St. (Lowery Ave. to Loi St), Loi St. (E. Manoa Rd. to Woodlawn Dr), Kahawai St. (Lowrey Ave. to Huapala St), Woodlawn Dr. (Lowrey Ave to Kahaloa St), Lowrey Ave. (Woodlawn Dr. to Kalawao St) Kaaipu Ave. (Oahu Ave. to end), Loomis St. (makua End to Makai end), Hiehie St. (Kaloaluiki St. to end) and Vista Place (Lowrey Ave to end) from 8:30am to 3:30am Mon. to Fri. |
|
| R012 |
Kapiolani Boulevard First Aid Repairs |
Roadway Rehabilitation |
Kapiolani Blvd - from Ward Ave. to South St. entire length and with - Weekend and Holiday work only from 7:00am to 6:00pm |
One travel lane will be closed at any given time.Interim repairs to roadway providing temporary smooth surface until permanent repairs can be made. |
| S000 and W000 |
Kapiolani Boulevard Water and Sewer Improvements |
Water and Sewer Line Improvements |
Temporary lane closures can be expected along Kapiolani Boulevard from Kalakaua Ave to Ward Ave, and along Kalakaua Avenue from Kapiolani Boulevard to the Aia Wai Bridge. Day Shift Work will be performed Monday to Saturday from 8 AM to 3 PM. Night Shift Work will be performed Sunday to Thursday from 7 PM to 5 AM. |
This project’s goal is to rehabilitate the existing sewer and water systems along Kapiolani Boulevard. The areas of rehab include Kapiolani Boulevard from Ward Avenue to Kalakaua Avenue, Kalakaua Avenue from Kapiolani Boulevard to Ala Wai Canal. The construction consists of installing new water mains and laterals, rehabilitating sewer lines using Cured-In-Place Pipe methods, reconstructing deteriorated sewer manholes, upgrading the electrical system for traffic signals, installing new curb ramps and repaving and restriping portions of travel lanes. |
| S001 |
Beretania Street - 1617 Sewer Rehabilitation, McCully |
Trenching for replacement of sewer line |
Intermittent lane closures on Beretania Street between Punahou Street to 1703 Beretania Street 8:30am to 3:30pm Mon. to Fri. |
|
| S004 |
Kalihi Valley Reconstructed Sewer, Area 1 to 4 |
Rehabilitate 19,503 feet of 6 to 18 inch sewer pipes and 13 laterals |
Work is on-going on various streets. Work is from 8:30 a.m. to 3:30 p.m. M - F. |
One lane to be opened to thru-traffic at all times. The majority of the work is trenchless excavation. Contractor has started probing along Jennie Street. Another Sewer System Improvement Project by the City and County of Honolulu |
| S005 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1E |
Structural and hydraulic rehabilitation of existing deficient gravity sewer |
Work is on-going on Vineyard Blvd. No lane closures are expected. Work hours: 8:30 a.m. - 3:30 p.m., M - F. |
One lane of traffic to be opened at all times Work within Malanai Lane is complete. Work on the existing sewer line in Vineyard Blvd. will not continue due to a 138 KV HECO line crossing under the sewer line. Website: honoluluroadwork.com |
| S006 |
Kalihi/Nuuanu Area Sewer Rehabilitation, Phase 1G |
Structural and hydraulic rehabilitation of existing deficient gravity sewer |
Intermitent lane closure along Kuakini Street |
Sewerline on Hialoa Street is complete. Roadway repaving to follow. Kauila Street work is on-going. Website: honoluluroadwork.com |
| S012 |
Peterson Lane and Pua Lane Sewer Rehabilitation |
Sewer rehabilitation of 4,450 feet of 8 - 12" diameter sewer line. |
Lane closures on King Street between Peterson Lane and Pua Lane Mon to Fri between 8:30 a.m. - 3:30 p.m. Lanes of traffic in the Diamond Head direction to be opened during rehabilitation work. |
Detour on Palama Street and N. King Street. One lane of traffic in each direction is opened on N. King Street |
| S015 |
University Avenue 1918 Sewer Rehabilitation Manoa |
Replacement of existing sewer |
Project has not started. |
|
| S016 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
Intermittent lane closures on Piikoi St (1164 Piikoi St to Pensacola St), Prospect St. (Pensacola St. to Thurston Ave), Wilder Ave (Pensacola St. to Thurston Ave), Kamamalu Ave (Iolani Ave to San Antonio), Hualii St (Kamamalu St. to Lusitana St), Avon Way (Spencer St to end), Victoria St. (Lunalilo St. to Green St), Emerson St. (Lunalilo St. to Green St), Alapai St (Magellan Ave to Prospect St), Iolani Ave (Frear St to Lusitana St), Prospect St. (Alapai St. to Miller St), 2220 - 2146 Kamehameha Hwy, Factory St (N. King St to Waterhouse), Kopke St. (Waterhouse to Stanley St), Gulick Ave (Waterhouse to Stanley St), Puuhale Rd. (Kahanu St. to Kaumaulii St), Bannister St (N. King St to 708 Bannister St), N. King St (Kopke St. to Kalii St), Kopke St. (Hanu Ln. to N. King St), Lanu Lane (Kopke St to end), Pulaa Ln. (N. King St to end), Huene St (Maui St to Wyllie St), Puunui Ave (Kauai St. to Hawaii St), Pahukui St (Nakuina St. to Gulick Ave), Kealoha St (Nakuina St. to Gulick ave),Uhu St. (Gulick Ave to end), 1048 Kamehameha IV Road to Coombs Ln., 1231 Gulick Ave to Kealoha St., 1032 Horner St to Middle St, 1214 - 1220 Kamehameha IV Rd, 1021 Middle St. to Kahauiki St, Kalihi St (Day Pl. to Beckley St), 1132-1146 Pinkham St., Hani Ln (Kalii St to Pulaa Ln), Leilani St (Fernandez St. to Lakapu St.), Fernandez St. (Adelaide St. to Leilani St), N. School St (Likelike Hwy to Haupu Pl), Adelaide St. (Fernandez St to Lakapu St), 1534 Gulick St. to N. School St., Waikoae Rd. (Amelia St to Martin St), 1667 - 1702 Lima St., Bulick Avenue (Ulana St. to Ano Ln) from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. Website: honoluluroadwork.com |
| S017 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
Intermittent lane closures on Meyer St. (Notley St. to 1530 Meyers St), 2354 Pio Pl. to Kamehameha IV Road, 1506 Kamehameha IV Road to Pio Place, 1556 Kamehameha IV Road to N. School St., 811-905 Umi St, 1801 - 1820 Ahuula St, 924 Self Lane to Akina St., 1734-1826 Eluwena St, 2112-2138 Mahalo St, 633-656 N. Judd St., 2042 - 2009 Nu Pl, Keola St (Kealakai St to Lanakila Ave), Lanakila Ave (N. Kuakini St to Simon Rd), Luka St. (Lanankila Ave. to Kealakai St), 1110 Hala Dr. to Kalepa Pl, Hala Drive (Laki Rd to Lolena St), Kealakai St. (Laki Rd. to Luka St), 2069 Iholena St. to N. Judd St, 818 Iholena Pl. to Iholena St from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. Website: honoluluroadwork.com |
| S019 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
Intermittent lane closures on 1843 - 1925 Pacific Heights, Punchal St. (Pali Hwy to Pali/Pauoa Rd), Nuuanu Ave (S. Kuakini St to Muliwai Lane), 27 Kauila St to Nuuanu Avenue, 1629 Nuuanu Avenue to Kauila St., 36 - 50 Bates, 20 Muliwai Lane to Nuuanu Avenue, 1817 - 1829 Lusitana St, 1817 Puowaina Dr to Kamamalu Avenue, 135 to 111 boyd Lane, 1819 Pacific Heights to S. Kuakini St, 214- 244 San Antonia Ave, 215 Puuhue Pl. to 1641 Stillman, Frog Lane (Puuhue Pl. to N. School St.) 1616 Stillman Lane to N. School St. from 8:30am to 3:30pm Mon. to Fri. |
OOne lane of traffic in each direction will be opened. Website: honoluluroadwork.com |
| S020 |
Houghtailing Street Area Sewer, Area 1 and 2 |
Rehabilitate existing sewer |
Intermittent lane closures on Houghtailing Street. from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. |
| S021 |
Wilhelmina Rise Sewer Rehabilitation |
Work on existing sewer line |
Intermittent lane closures on Keanu St (wilhelmina Rise to 13th Ave), Wilhelmina Rise (Keanue St to Pukalani Pl), Wilhelmina Rise (Sierra Dr. to Sierra Dr), Sierra Dr (Nihipale Place to Halehoola Pl), Halehoola Pl. (Sierra Dr to end), Anuhea Place (Anuhea St. to end), Puumalu Place (Paula Dr. to end) Paloma Pl. (Paula Dr to end), Pili Place (Paula Dr to end), Carnation Place (Iwi Way to end), Iwi Way (Niele Pl. to Paula Dr), Pioi Pl(Niele Pl. to end), Lurline Dr. ( Monterey Dr to Matsonia Dr), Lanipoki Pl. (Lurline Dr. to end) and Lurline Dr. near Sierra Drive from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. |
| S023 |
St. Louis Heights Sewer Rehabilitation |
Rehabilitate existing sewer |
Intermittent lane closures on St. Louis Dr (Dole St. to Bertram St), Dole St. (St. Louis Dr. to Frank St.), Frank St. (Dole St. to Eugene Pl), Eugene Pl. (Frank St. to end), Alphonse Place (Frank St. to end), Robert Place (Frank St. to end), Kaminaka Dr. (St. Louis Dr. to Kanalui St), Kalaepohaku (Kaminaka Dr. to Akeakamai St), Pule Place (Kalaepohaku to end), Kalaepohaku to end, Kanalui St. (Kaminaka Dr. to end), Akeakamai St. (Kaminaka Dr. to end), Alencastre St. (St. Louis Dr. to St. Louis Dr), Felix Street (Alencastre St. to St. Louis Dr), Gulston St. (Alencastre St. to St. Louis Dr), Herman St. (Alencastre St. to St. Louis Drive), Libeert St. (Alencastre St. to St. Louis Dr), Maigret St. (Alencastre St. to end), Alencastre Place (Alencastre St. to end), Bertram St. (St. Louis Dr. to Peter St), Noah St. (St. Louis Dr. to St. Louis Dr), Oswald St. (St. Louis Dr. to St. Louis Dr), Peter St. (St. Louis Dr. to end), Quincy Place (Peter St. to end), Ruth Place (Peter St. to end) from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. |
| S026 |
Kalihi/Nuuanu Area Sewer Rehabilitation |
Sewer line rehabilitation |
Intermittent lane closures between N. Judd Street to 1069 Iholena Street from 8:30am to 3:30pm Mon. to Fri. |
|
| S031 |
Puolo Drive 1085 Sewer Rehabilitation |
Sewer line rehabilitation |
Intermittent lane closures on 1079 Puolo Drive to Ukama Street from 8:30am to 3:30pm Mon. to Fri. |
|
| S033 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase1C |
Rehabilitation of existing sewer |
Construction is ongoing on Kalama, Kanoelani and Laniuma Road. One lane of traffic in each direction is available. Work is from 8:30 a.m. to 3:30 p.m., M-F |
Middle Street - H-1 to Kamehameha Hwy, Horner Street - H-1 to Omilo Lane, Kamehameha IV Rd. from Pio Place to School St.,Kanoelani Road from Hiu Street to end, Kalama Road from Hiu St. to End, Laniuma Road from Hiu Street to end, Amelia Street from Waikoae Road to School Street, Waikoae Road from Amelia Street to Martin Street, Dement Street from Lohilani St. to Ula Lane, Ula Lane from Dement Street to end, Gulick Avenue from H-1 to Pahukui Street,Gulick Avenue from School Street to Hiki St., Fernandez Street from Adelaide Street to Kalihi St. and Kalihi Street from Mailu Street to Perry Street.Website: honoluluroadwork.com |
| S034 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D |
Rehabilitation of existing sewer |
Intermittant lane closures from 8:30 am to 3:30 pm M-F on Lanakila Avenue and School Street, Alaneo Street from School St. to Kuakini St., Lolena St. from Kealakai St. to Iholena St., Pacific Heights Road from 2455B to 2455C, Captain Cook Avenue and Alapai Street, Wilder Avenue from Piikoi Street to Makiki Apts. |
Lanakila Avenue and School Street, Alaneo Street from School St. to Kuakini St., Lolena St. from Kealakai St. to Iholena St., Pacific Heights Road from 2455B to 2455C, Captain Cook Avenue and Alapai Street, Wilder Avenue from Piikoi Street to Makiki Apts. Website: honoluluroadwork.com |
| S035 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A |
Rehabilitation of existing sewer |
Intermittant lane closures from 8:30 am to 3:30 pm M-F on Puuhale Rd. from Kalani Street to Dillingham Blvd., Mokauea St. from Kalani St. to Dillingham Blvd., Hau Street from Puuhale Rd. to Kalihi St., Colburn St. from Puuhale Rd. to Kalihi St., Dillingham Blvd from Puuhale rd. to Mokauea St., Eluwene St. from Puuhale Rd. to Kalihi St., Kaumaualii St. from Puuhale Rd. to Kalihi St., Ahuula Street from Puuhale Rd. to Mokauea Street. |
Puuhale Rd. from Kalani Street to Dillingham Blvd., Mokauea St. from Kalani St. to Dillingham Blvd., Hau Street from Puuhale Rd. to Kalihi St., Colburn St. from Puuhale Rd. to Kalihi St., Dillingham Blvd from Puuhale rd. to Mokauea St., Eluwene St. from Puuhale Rd. to Kalihi St., Kaumaualii St. from Puuhale Rd. to Kalihi St., Ahuula Street from Puuhale Rd. to Mokauea Street. Website: honoluluroadwork.com |
| W002 |
Maunalaha Homesites W.S.I. |
8" D.I. water main installation |
Round Top Dr. between Makiki St. & Maunalaha Rd. 8:30 a.m. to 3:30 p.m. Mon. to Fri. |
|
| W008 |
Kalihi WSI Part I |
Installing water mains |
Lane closures on Kamehameha IV Rd below School St. between 7:30am to 3:30 pm. Mon-Fri |
Another Water System Improvement Project by the Board of Water Supply |
| W010 |
LOCK UP STORAGE |
Installing water meters |
LANE CLOSURES ON KAPIOLANI BETWEEN MCCULLY AND KALAKAUA 830A-330P MON-FRI |
|
CENTRAL OAHU
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H003 |
Kamehameha Highway |
Guardrail and Drainage Work |
Alternating single lane closures on Kamehameha Hwy between Leilehua Golf Course Road and Waihau St. in both directions, weekdays, 8:30 am to 3:00 pm |
|
| H004 |
Kamehameha Highway |
Pavement Sealing Work |
Alternating single lane closures on Kamehameha Hwy between H-2 Freeway and Karsten Thot Bridge in both directions, weeknights, 8:00 pm to 5:00 am |
|
| P005 |
Lakeview Circle Development |
S/W, D/W, Utility |
Intermittent lane closures on Lakeview Circle from 8:30am-3:30pm Mon. to Fri. |
|
EAST HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H025 |
Kalanianaole Hwy. near Hanauma Bay |
Paving and Shoulder Work |
Intermittent single lane closures on Kalanianaole Hwy., weekdays, 8:30 am to 3:00 pm |
|
| H027 |
Kalanianaole Hwy., Sewer Line Work near Hawaii Kai |
Sewer Line Work |
Alternating single lane closure between Paeoki Drive and Kuliouou Road in both directions, weekdays, 8:30 am to 2:30 pm |
|
| R004 |
Rehabilitation of Street, Unit 38 |
Pavement reconstruction/
resurfacing |
Work has resumed on Kilauea Avenue from 8:30 a.m. to 3:30 p.m. Monday to Friday |
One lane of traffic to be opened in each direction during construction. |
| S010 |
Kuliouou Sewer Rehabilitation and WWPS Modifications - Sewer rehabilitation |
Sewer rehabilitation |
Work has resumed on Summer Street. Work hours are from 8:30 a.m. to 3:30 p.m. Monday to Friday open cut work with one lane closure on Kalanianaole Highway between Elelupe Road and Paeoki Drive |
One lane of traffic in each direction will be opened. |
| S025 |
Kahala Avenue Sewer Structural Rehabilitation |
Sewer line rehabilitation |
Project has not started. |
|
| W003 |
job 08-004 Wilhelmina Rise Water System Improvements, Part III |
install new water main |
Intermittent lane closures on Wilhelmina Rise between Anuhea St. and Sierra Dr. at Maunalani Park. 8:30am to 3:30pm M-F. Contractor progressing from mauka end of Wilhelmina Rise headed Makai.Currently working between Maunalani Park and Hilo Pl. |
|
EWA
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H010 |
Fort Weaver Road |
Road Widening |
Left lane closure in both directions on Fort Weave Rd. between Old Fort Weaver Road and Geiger Road, weekdays, from 7:00 am to 1:00 pm for pavement striping |
Fort Weaver Road from Laulanui Street to Geiger Rd. |
| H013 |
North South Road Phase 1C |
Farrington Hwy Reconstruction Work |
Lane closures in westbound direction in the vicinity of North-South Road, weekdays, 8:30 am to 3:00 pm |
Contraflows will be in effect during construction hours |
| H022 |
H-1 Pearl City Viaduct, H-1/H-2 Merge |
Deck Replacement Work |
H-1 Pearl City Viaduct, H-1/H-2 merge to Waimalu Off Ramp, 3 eastbound right lanes closed, Monday to Thursday nights, 7:00 pm to 4:am |
|
| H024 |
Farrington Highway at Piliokahi Ave. |
Waterline Replacement |
Two-lane closure on Farrington Hwy. in the eastbound direction, weekdays, 8:30 am to 3:00 pm |
|
| P006 |
Street Improvements for Kapolei Commons |
Roadway Widening |
Intermitant lane closures and detoured lanes on Kalaeloa Blvd from H-1 Freeway to Lauwilwili Rd throughout the week and weekend |
Roadway Improvements for the Kapolei Commons Commerical Development on Kalaeloa Road |
| P010 |
Street Improvements for Costco Kapolei |
Roadway Improvements |
Intermitant lane closures and detoured lanes on Kapolei Parkway from Kamokila Blvd to Kalaeloa Blvd throughout the week and weekend |
|
| S013 |
Renton Road Sewer and Manhole Rehabilitation |
Replacement/
repair of 11,670 feet and 52 sewer manholes |
Intermittent lane closures on Renton Road at various locations from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. |
LEEWARD
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| R010 |
Rehabilitation of Secondary Streets by Contract - FY 09 Group 2 |
Roadway reconstruction/
resurfacing |
Intermittant lane closures on Halona Rd (Lualualei Homestead Rd to Puhawai Rd) and Lualualei Homestead Rd (Hale Ekahi Dr. to end) 8:30am to 3:30pm Mon. to Fri. |
One lane of thru traffic will be available at all times |
| W004 |
FARRINGTON HIGHWAY PART I, PHASE "A" & "B" 12-INCH AND 24-INCH WATER MAINS |
INSTALLATION OF NEW 12-INCH AND 24-INCH WATER MAINS |
Along Farrington Hwy. at Nanakuli Ave. intersection, left lane closed on the Honolulu bound lanes and the Waianae bound lanes, and Nanakuli Ave. closed (depending on traffic on Farrington Hwy.) ... 1 Waianae bound & 1 Honolulu bound lane open. (8:30 am to 3:00 pm). Two Special Duty Officers to control traffic flow ( Assist contractor at work area.). |
BWS PROJECT INFO PHONE NUMBER: 748-5130. |
| W005 |
99-41 FARRINGTON HIGHWAY : 30inch and 24 inch Transmission Mains - Ph I |
INSTALLATION OF NEW 24" DI MAIN. Start of chlorination and flushing of new 24" DI water main. |
Delta will be working on Farrington Hwy between Waimea st and Laaloa St. There will be a contraflow set up with 2 Honlulu bound lanes and 1 Waianae bound lane from 8:30am to 1:30pm and 2 Waianae bound and 1 Honolulu bound lane from 1:30pm to 2:30pm. Also work on Farrington Hwy near Aliinui Dr Sholuder area. There will also be night work from June 26 until June 30. Left Waianae bound lane will be closed near Aliinui Dr from 7pm until 3am. Also during the night work small sections (6' x 12') on Laaloa St, Waiomea St, and Farrington Hwy Honolulu bound near Aliinui Dr. will be coned off, but no lane closures. |
|
NORTH SHORE - NO ADVISORIES
WEST HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H016 |
H-1 Freewy, Airport Viaduct |
Concrete pavement repair |
3 middle lane closure on H-1 outbound near Keehi Interchange and 3 right lane closure west of airport on-ramp, Sunday, 6:00 am to 10:00 pm; 3 left lane closure on H-1 townbound east of airport on-ramp, weeknights, 9:00 pm to 5:00 am, and, 3 right lane closure on H-1 airport viaduct townbound west of airport on-ramp, weeknights, 6:00 pm to 5:00 am |
Use alternate routes |
| H020 |
Nimitz Highway/Pacific Street Intersection |
Traffic Signal Work |
Two lanes closed in eastbound direction on Nimitz Hwy. from Pier 31 to Pacific Street; Single lane closure on Pacific Street in either direction. Weekdays, 8:30 am to 3:00 pm |
|
| R005 |
Rehabilitation of Streets, Unit 49 |
Roadway reconstruction/
resurfacing |
Intermittent lane closures on Alewa Drive between Wyllie Street to Hoomaikai Street 8:30am to 3:30pm Mon. to Fri. |
Work is on Alewa Drive between Wyllie Street to Hoomaikai Street |
| S027 |
Waipahu Street/Plantation Village Sewer Reconstruction |
Sewer line rehabilitation |
Existing sewerline CCTV'd. Rerouting of sewer line is under consideration based on review of DVD. No lane closure is expected. |
|
| S029 |
Hanawai Circle Sewer Rehabilitation |
Sewer line rehabilitation |
Intermittent lane closures on Farrington Hwy (Waipahu Depot to Hanawai Circle) and Hanawai Circle (Farrington Hwy to end) from 8:30am to 3:30pm Mon. to Fri. |
|
| S030 |
Kilani Avenue 211/Ilima Street 91 Sewer Rehabilitation, Wahiawa |
Sewer line rehabilitation |
Intermittent lane closures on California Avenue to 75 Ilima Street from 8:30am to 3:30pm Mon. to Fri. |
|
| W006 |
Kalihi WSI Part II Ph.B |
Adjusting and removing of manholes, Misc. Sidewalk work |
Lane closures between Kanakanui St. to King St. and Kalihi St. to Puuhale St. occuring between 8:30am to 3:30pm Mon-Fri |
|
| W007 |
Sand Island WWTP |
Installing water meters |
Lane closures on Sand Island Parkway fronting the Wastewater Treatment Plant occuring between 8:30am to 3:30pm Mon-Fri. |
|
WINDWARD
Project ID |
Project Name |
Reason for Lane Closure |
Street Location, Limits, and Date & Time of Lane Closure |
Additional Comments and Website Address |
| H018 |
Kamehameha Highway, Burroughs Rd. and Kualoa Regional Park Rd. |
Drainage box construction, concrete backfill and pavement restoration |
Single lane closures in both directions between Vurroughs Road and Enos Road, weekdays, 8:30 am to 3:00 pm |
|
| H021 |
Kahekili Highway, West Hui Iwa St. to East Hui Iwa St. |
Trenching and Pavement Repair |
Possible lane closures on Kahekili Highway between West Hui Iwa St. and East Hui Iwa St. in both directions, weekdays, 8:30 am - 3:00 pm |
|
| P001 |
151 Hekili St |
2412 frontage imp. |
Intermittent lane closures on Hekili St and Hahani St lane |
|
| R013 |
Rehabilitation of Streets, Unit 46 |
Roadway reconstruction/
resurfacing |
Kailua Road (Hamakua Bridge to Kuulei Road); and Kuulei Road (Kailua Road to Kainalu Drive) from 8:30 a.m. to 3:30 p.m. Mon. to Fri. |
One lane of traffic in each direction will be opened. |
| R015 |
Rehabilitation of Streets, Unit 63 |
Roadway reconstruction/
resurfacing |
Kuukama Street (Kalaheo Ave to end), Kuuala Street (Kuukama St. to end), Kuumele Place, Kuuhala St. (Kuuala St. to Kainalu Dr), and Kuuniu Place. Intermittent lane closures from 8:30 a.m. to 3:30 p.m. M - F. |
One lane of traffic in each direction will be open. |
| S002 |
Kailua/Kaneohe Sewer Rehabilitation-Phase 1 |
Sewer replacement |
Contractor working on spot repairs and CIPP lining work has commenced along Keolu Drive. |
|
| S003 |
Kalaheo Avenue, Mokapu Road/Aikahi Loop Sewer Rehabilitation |
Rehabilitate 3,400 feet of 66-inch diameter pipe and 9 manholes. |
Work is from 8:30 a.m. to 3:30 p.m. M - F. |
One lane to be opened to thru-traffic at all times. Drivers are asked to use caution where steel plates cover the sewer bypass trenches.Work is proceeding on the diversion chamber. |
| S018 |
Kaneohe Bay Drive Trunk Sewer Relocation |
Relocation of existing trunk line |
Intermittent lane closures on 818 Iholena Place to Iholena Street, 44-11 to 44-2 Malukai Place, 44-13 to 44-1 Nohokai Place and 44-6 to 44-2 Hulakai Place. from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. |
| S022 |
Wanaao Road/Keolu Drive Reconstructed Sewer |
Rehabilitation existing sewer |
Intermittent lane closures on Keolu Dr (Nanialii St. to Wanaao Rd) and Wanaao Rd. (Keolu Dr. to Auwinala Rd) from 8:30am to 3:30pm Mon. to Fri. |
One lane of traffic in each direction will be opened. Micro tunnelling shafts along Keolu Drive continues. A slipline repair has been agreed upon and Coluccio has been given the NTP to start work. |
|